LIEBERT® NXL™ 500-750KVA, 1+1 (DISTRIBUTED BYPASS) MULTI-MODULE SYSTEM SITE PLANNING DATA Table 1 Site planning data—500-750kVA UPS Rating kVA kW AC Input/Output Voltage, VAC 500 450 480 625 562.5 480 750 675 480 750 675 750 675 Input Isolation Transformer Rectifier AC Input Current Bypass/Output AC Output Current Nom Max Nom Maximum Battery Current at End of Discharge (A) 643 804 601 1241 Maximum Heat Dissipation, Full Load, BTU/h (kW) 124,805 (36.6) 799 995 752 1530 167,265 (49.0) 975 1219 902 1845 213,587 (62.6) 575 815 1018 753 1851 215,790 (63.2) 600 759 949 722 1845 200,173 (58.7) 2,3,4,6,7,8,10,11 5,6,8,10,11 — See Notes below: YES — 1,3,6,7,8,10,11 Dimensions WxDxH, in. (mm) Approximate Weight Unpacked, lb. (kg) 111.6x39.4x76.8 (2835x1000x1950) 10,310 (4677) 140.5x39.4x76.8 (3568x1000x1950) 13,650 (6192) 9 9 Notes for Table 1 1. 2. 3. 4. 5. 6. Nominal rectifier AC input current (considered continuous) is based on full rated output load. Maximum current includes nominal input current and maximum battery recharge current (considered non-continuous). Maximum input current is controlled by current limit setting which is adjustable 25 to 125% of nominal input current. Bypass AC input and AC output current (considered continuous) is based on full rated output load. Emerson recommends that feeder protection (by others) for the rectifier AC input and the bypass AC input be provided by separate overcurrent protection devices. UPS output load cables must be run in separate conduit from input cables. Power cable from module DC bus to battery should be sized for a total maximum 2.0V line drop (power cable drop plus return cable drop as measured at the module) at maximum discharge current. Grounding conductors to be sized per NEC 250-95. Neutral conductors to be sized for full capacity per NEC 310-16, Note 10 for systems with 4-wire loads and 20% minimum capacity for 3-wire loads. NOTE: A neutral conductor is required from each Multi-Module Unit output to the System Switch Board. 7. 8. 9. 10. 11. 12. 13. 1 Rectifier AC Input: 3-phase, 3-wire, plus ground Bypass AC Input: 3-phase, 4-wire, plus ground (3-wire plus ground in certain circumstances) AC Output to Load: 3-phase, 3- or 4-wire, plus ground Module DC Input from Battery: 2-wire (positive and negative), plus ground Module Output to SPC: 3-phase, 4-wire, plus ground All wiring is to be in accordance with National and Local Electrical Codes. Minimum overhead clearance is 2 ft. (0.6m) above the UPS. Top or bottom cable entry through removable access plates. Cut plate to suit conduit size. Control wiring and power cables must be run in separate conduits. Control wiring must be stranded tinned conductors. Dimensions and weights do not include the System Paralleling Cabinet. For optimal load sharing performance, the difference in bypass circuit cable length must be 10% or less from longest to shortest. Cable length should be measured from common point of input to common point of output. If needed, contact your Emerson representative to determine if other lengths are be acceptable. Liebert® NXL™ 500-750kVA, 1+1 (Distributed Bypass) Multi-Module System Site Planning Data Numbers in this illustration refer to notes below the table on page 1 3 2 2 MBB MIB 7 UPS Module 2 BFB Bypass AC Input 3 7 1 Rectifier AC Input 6 DC Bus CB1 Battery System 3 7 7 5 CB2 MBD UPS Module BFB MOB 4 1 Rectifier AC Input 7 7 2 Bypass AC Input 3 4 System Paralleling Cabinet 3 6 DC Bus CB1 Battery System 5 CB2 7 MOB 7 MBD The Liebert NXL is compatible with high resistance ground systems. See your local Emerson representative for details. © 2009 Liebert Corporation Technical Support / Service United States All rights reserved throughout the world. Specifications subject to change without notice. 1050 Dearborn Drive 800-543-2378 ® Liebert is a registered trademark of Liebert Corporation. All names referred to are trademarks or registered trademarks of their respective owners. [email protected] P.O. Box 29186 SL-25523_REV2_02-14 Web site: www.liebert.com 2 Columbus, OH 43229