REV: 13-10-01 Part Ⅱ Carrier Tape Outline Drawing 1 Table of Contents Part Ⅱ - Carrier Tape Outline Drawing SOP-8 CARRIER TAPE OUTLINE DRAWING -------------------------------------------------- Ⅱ-1 SOP-14 CARRIER TAPE OUTLINE DRAWING ------------------------------------------------- Ⅱ-2 SOP-16 CARRIER TAPE OUTLINE DRAWING ------------------------------------------------- Ⅱ-3 SOP-16W CARRIER TAPE OUTLINE DRAWING ---------------------------------------------- Ⅱ-4 SOP-20 CARRIER TAPE OUTLINE DRAWING ------------------------------------------------- Ⅱ-5 SOP-24 CARRIER TAPE OUTLINE DRAWIN --------------------------------------------------- Ⅱ-6 SOT-23/SOT-23-5/SOT-23-6 CARRIER TAPE OUTLINE DRAWING --------------------- Ⅱ-7 SOT-89 CARRIER TAPE OUTLINE DRAWING ------------------------------------------------- Ⅱ-8 SOT-143 CARRIER TAPE OUTLINE DRAWING ----------------------------------------------- Ⅱ-9 SOT-223 CARRIER TAPE OUTLINE DRAWING ----------------------------------------------- Ⅱ-10 MSOP-8/10 CARRIER TAPE OUTLINE DRAWING -------------------------------------------- Ⅱ-11 TO-252 CARRIER TAPE OUTLINE DRAWING ------------------------------------------------- Ⅱ-12 TO-263 CARRIER TAPE OUTLINE DRAWING ------------------------------------------------- Ⅱ-13 QFN 3x3x0.6 CARRIER TAPE OUTLINE DRAWING ----------------------------------------- Ⅱ-14 QFN 3x3x0.9 CARRIER TAPE OUTLINE DRAWING ----------------------------------------- Ⅱ-15 QFN 4x4x0.9 CARRIER TAPE OUTLINE DRAWING ----------------------------------------- Ⅱ-16 DFN 2x2x0.75 CARRIER TAPE OUTLINE DRAWING ---------------------------------------- Ⅱ-17 DFN 3x3x0.75 CARRIER TAPE OUTLINE DRAWING ---------------------------------------- Ⅱ-18 SC-70/SC-82 CARRIER TAPE OUTLINE DRAWING ----------------------------------------- Ⅱ-19 TSSOP-16 CARRIER TAPE OUTLINE DRAWING -------------------------------------------- Ⅱ-20 II-1 Part II Carrier Tape Outline Drawing (unit: mm) SOP-8 CARRIER TAPE OUTLINE DRAWING Po P2 P1 A Bo W F E1 φDo Ko Ao B φD1 A B T SECTION A-A SECTION B-B SYMBOL Ao Bo Ko T SPEC. 6.30±0.20 5.20±0.20 2.10±0.20 0.30±0.05 SYMBOL Po P1 P2 E1 SPEC. 4.00±0.10 8.00±0.10 2.00±0.05 1.75±0.10 Do 1.50 D1 +0.10 1.50 min. -0.00 F W 5.50±0.05 12.00±0.30 Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-2 SOP-14 CARRIER TAPE OUTLINE DRAWING Po P2 P1 A Bo W F E1 φDo Ko Ao B φ D1 B A T SECTION A-A SECTION B-B SYMBOL Ao Bo Ko T Do D1 SPEC. 6.5 ±0.2 9.2 ±0.35 2.1 ±0.2 0.30 ±0.05 + 0.1 1.5 - 0.0 1.50 min. SYMBOL Po P1 P2 E1 F W SPEC. 4.0 ±0.1 8.0 ±0.1 2.0 ±0.1 1.75 ±0.1 7.5 ±0.1 16.0 ±0.3 Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-3 SOP-16 CARRIER TAPE OUTLINE DRAWING φDo P2 P1 A Bo W F E1 Po Ko Ao B φD1 B A T SECTION A-A SECTION B-B SYMBOL Ao Bo Ko T Do D1 SPEC. 6.5 ±0.2 10.3 ±0.2 2.1 ±0.2 0.30 ±0.05 + 0.1 1.5 - 0.0 1.50 min. SYMBOL Po P1 P2 E1 F W SPEC. 4.0 ±0.1 8.0 ±0.1 2.0 ±0.1 1.75 ±0.1 7.5 ±0.1 16.0 ±0.3 Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-4 SOP-16W CARRIER TAPE OUTLINE DRAWING Po P2 P1 A Bo W F E1 φDo Ko B Ao φD1 B A T SECTION A-A SECTION B-B SYMBOL Ao Bo Ko T Do D1 SPEC. 10.9 ±0.2 10.7 ±0.2 3.2 ±0.2 0.30 ±0.05 + 0.1 1.5 - 0.0 1.50 min. SYMBOL Po P1 P2 E1 F W SPEC. 4.0 ±0.1 12.0 ±0.1 2.0 ±0.1 1.75 ±0.1 7.5 ±0.1 16.0 ±0.3 Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-5 SOP-20 CARRIER TAPE OUTLINE DRAWING Po P2 P1 A Bo W F E1 φDo Ko Ao B φD1 A B T SECTION A-A SECTION B-B SYMBOL SPEC. SYMBOL SPEC. Ao Bo 10.90±0.20 13.30±0.20 Po P1 4.00±0.10 12.00±0.10 Ko T 3.10±0.20 0.30±0.05 P2 E1 2.00±0.10 Do 1.50 +0.10 -0.00 F D1 1.50 min. W 1.75±0.10 11.50±0.10 24.00±0.30 Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-6 SOP-24 CARRIER TAPE OUTLINE DRAWIN Po P2 P1 A Bo W F E1 φDo Ko Ao B φD1 A B T SECTION A-A SECTION B-B SYMBOL SPEC. SYMBOL SPEC. Ao Bo Ko 10.90±0.20 15.90±0.20 3.10±0.20 Po P1 P2 4.00±0.10 12.00±0.10 2.00±0.10 T 0.30±0.05 E1 1.75±0.10 Do 1.50 D1 +0.10 1.50 min. -0.00 F W 11.50±0.10 24.00±0.30 Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-7 SOT-23/SOT-23-5/SOT-23-6 CARRIER TAPE OUTLINE DRAWING Po P2 P1 A W Bo F E1 φDo Ko B Ao T SECTION A-A A φD1 B SECTION B-B SYMBOL Ao Bo Ko T Do SPEC. 3.15±0.20 3.20±0.20 1.45±0.25 0.22±0.05 SYMBOL Po P1 P2 E1 F W SPEC. 4.00±0.10 4.00±0.10 2.00±0.05 1.75±0.10 3.50±0.05 8.00±0.30 1.50 +0.10 -0.00 D1 1.00 min. Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-8 SOT-89 CARRIER TAPE OUTLINE DRAWING Po P2 P1 A Bo W F E1 φDo Ko Ao B φD1 A B T SECTION A-A SECTION B-B SYMBOL Ao Bo Ko T SPEC. 4.80±0.20 4.50±0.20 1.80±0.20 0.30±0.05 SYMBOL Po P1 P2 E1 F W SPEC. 4.00±0.10 8.00±0.10 2.00±0.05 1.75±0.10 5.50±0.05 12.00±0.30 Do 1.50 +0.10 -0.00 D1 1.50 min. Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-9 SOT-143 CARRIER TAPE OUTLINE DRAWING Po P2 P1 A W Bo F E1 φDo Ko B Ao T SECTION A-A A φD1 B SECTION B-B SYMBOL Ao Bo Ko T SPEC. 3.20±0.20 2.70±0.20 1.35±0.20 0.20±0.03 SYMBOL Po P1 P2 E1 F W SPEC. 4.00±0.10 4.00±0.10 2.00±0.05 1.75±0.10 3.50±0.05 8.00±0.30 Do 1.50 D1 +0.10 1.00 min. -0.00 Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-10 SOT-223 CARRIER TAPE OUTLINE DRAWING Po P2 P1 A Bo W F E1 φDo Ko Ao B φD1 A B T SECTION A-A SECTION B-B SYMBOL Ao Bo Ko T SPEC. 6.90±0.20 7.50±0.20 2.10±0.20 0.30±0.05 SYMBOL Po P1 P2 E1 SPEC. 4.00±0.10 8.00±0.10 2.00±0.05 1.75±0.10 Do 1.50 D1 +0.10 1.50 min. -0.00 F W 5.50±0.05 12.00±0.30 Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-11 MSOP-8/10 CARRIER TAPE OUTLINE DRAWING Po P2 P1 A Bo W F E1 φDo Ko Ao B A φD1 B T SECTION A-A SECTION B-B SYMBOL Ao Bo Ko T SPEC. 5.20±0.20 3.30± 0.20 1.60±0.20 0.30±0.05 SYMBOL Po P1 P2 E1 SPEC. 4.00± 0.10 8.00± 0.10 2.00±0.05 1.75±0.10 Do 1.50 +0.10 -0.00 D1 1.50 min. F W 5.50±0.05 12.00± 0.30 Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-12 TO-252 CARRIER TAPE OUTLINE DRAWING Po P2 P1 A Bo W F E1 φDo Ko Ao B φD1 B A T SECTION A-A SECTION B-B SYMBOL SPEC. Ao Bo Ko 6.90±0.20 10.50±0.20 2.60±0.20 T 0.30±0.05 SYMBOL Po P1 P2 E1 SPEC. 4.00±0.10 8.00±0.10 2.00±0.10 1.75±0.10 Do D1 1.50 +0.10 1.50 min. -0.00 F W 7.50±0.10 16.00±0.30 Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-13 TO-263 CARRIER TAPE OUTLINE DRAWING φDo P1 A Bo W F E1 Po P2 Ko Ao B φD1 A B T SECTION A-A SECTION B-B SYMBOL SPEC. SYMBOL SPEC. Ao Bo Ko 10.60±0.20 16.10±0.50 4.90±0.20 *Note6 Po P1 P2 4.00±0.10 16.00±0.10 2.00±0.10 T Do 0.35±0.05 1.50 E1 D1 +0.10 1.50 min. -0.00 F W 1.75±0.10 11.50±0.10 24.00±0.30 Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier 6. Ao and Bo must keep the lateral movement of the component within 1.0 mm in the pocket II-14 QFN 3x3x0.6 CARRIER TAPE OUTLINE DRAWING Po P2 P1 A Bo W F E1 φDo Ko B Ao A φD1 B T SECTION A-A SECTION B-B Do SYMBOL Ao Bo Ko T SPEC. 3.30±0.20 3.30±0.20 0.90±0.20 0.30±0.05 SYMBOL Po P1 P2 E1 F W SPEC. 4.00±0.10 8.00±0.10 2.00±0.05 1.75±0.10 5.50±0.05 12.00±0.30 1.50 +0.10 -0.00 D1 1.50 min. Note : 1. 10 sprocket hole pitch cumulative tolerance ± 0.2 2. Material: conductive polystyrene 3. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 4 Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-15 QFN 3x3x0.9 CARRIER TAPE OUTLINE DRAWING Po P2 P1 A φD1 B A Bo W F E1 φDo Ko Ao B T SECTION A-A SECTION B-B Do SYMBOL Ao Bo Ko T SPEC. 3.30±0.20 3.30±0.20 1.20±0.20 0.30±0.05 SYMBOL Po P1 P2 E1 F W SPEC. 4.00±0.10 8.00±0.10 2.00±0.05 1.75±0.10 5.50±0.05 12.00±0.30 1.50 +0.10 -0.00 D1 1.50 min. Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-16 QFN 4x4x0.9 CARRIER TAPE OUTLINE DRAWING Po P2 P1 A Bo W F E1 φDo Ko Ao B φD1 A B T SECTION A-A SECTION B-B SYMBOL Ao Bo Ko T SPEC. 4.40±0.20 4.40±0.20 1.20±0.20 0.30±0.05 SYMBOL Po P1 P2 E1 F W SPEC. 4.00±0.10 8.00±0.10 2.00±0.05 1.75±0.10 5.50±0.05 12.00±0.30 Do 1.50 +0.10 -0.00 D1 1.50 min. Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-17 DFN 2x2x0.75 CARRIER TAPE OUTLINE DRAWING Po P2 P1 W Bo F E1 φDo Ko Ao φD1 T SECTION A-A SECTION B-B φDo φD1 SYMBOL Ao Bo Ko T SPEC. 2.30±0.10 2.30±0.10 1.15±0.10 0.26±0.04 SYMBOL Po P1 P2 E1 F W SPEC. 4.00±0.10 4.00±0.10 2.00±0.05 1.75±0.10 3.50±0.05 8.00±0.30 1.50 +0.10 1.00 +0.25 -0.00 -0.00 Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-18 DFN 3x3x0.75 CARRIER TAPE OUTLINE DRAWING Po P2 P1 A Bo W F E1 φDo Ko B Ao φD1 A B T SECTION A-A SECTION B-B SYMBOL Ao Bo Ko T SPEC. 3.30±0.20 3.30±0.20 1.15±0.25 0.30±0.05 SYMBOL Po P1 P2 E1 F W SPEC. 4.00±0.10 8.00±0.10 2.00±0.10 1.75±0.10 5.50±0.10 12.00±0.30 Do 1.50 +0.10 -0.00 D1 1.50 min. Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-19 SC-70/SC-82 CARRIER TAPE OUTLINE DRAWING Po P2 P1 W Bo F E1 φDo Ko Ao φD1 T SECTION A-A SECTION B-B SYMBOL Ao Bo Ko SPEC. 2.25 ±0.10 2.40 ±0.10 1.22 ±0.10 SYMBOL Po P1 P2 E1 SPEC. 4.00 ±0.10 4.00 ±0.10 2.00 ±0.05 1.75 ±0.10 T 0.254 ± 0.02 φDo 1.50 φD1 +0.10 1.00 +0.25 -0.00 -0.00 F 3.50 ±0.05 8.00 W +0.30 -0.10 Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-20 TSSOP-16 CARRIER TAPE OUTLINE DRAWING Po P2 P1 A Bo W F E1 φDo Ko Ao B φD1 A B T SECTION A-A SECTION B-B Do SYMBOL Ao Bo Ko T SPEC. 6.80±0.20 5.40±0.20 1.60±0.20 0.30±0.05 SYMBOL Po P1 P2 E1 F W SPEC. 4.00±0.10 8.00±0.10 2.00±0.05 1.75±0.10 5.50±0.05 12.00±0.30 1.50 +0.10 -0.00 D1 1.50 min. Note: 1. Refer to EIA-481-B 2. 10 sprocket hole pitch cumulative tolerance ± 0.2 3. Material: conductive polystyrene 4. Ao and Bo measured on a plane 0.3mm above the bottom of the pocket 5. Ko measured from a plane on the inside bottom of the pocket to the top surface of the carrier II-21