Data Communications Data Communications Implementation Team (DCIT) Implementation Team (DCIT) DCIT #33 PLENARY DCL Trials Update 06/04/2014 Matt Maki DCL Trials Lead Federal Aviation Administration Updated DTAP Build 7.2 Schedule • Build 7.2 Full Climb Via SID Compliance: - • Compliance with full 7110.113 CVS Changes CVS, CVS Except Maintain, Maintain ALT Selections Arrival/Departure Loadability, FD DL Response to AOC Full month WJHTC lab testing period MEM/EWR ATC to conduct B7.2 ATC training (Harris training sheet) Proposed Build 7.2 Schedule: - June 18-19: June 23: June 24 - July 24: July 24: July 28-30: B7.2 FAT at Thales Install/SAT at FAATC Testing at FAATC Final MEM/EWR Install Decision Point Install and SAT at MEM and EWR (Parallel installs) Federal Aviation Administration KEWR DCL Trials Status Update • UAL, FDX, UPS Daily DCL Ops Ongoing: - • DTAP Build 7.1 running stable UAL to schedule remaining 9 B767 Fleet qualifying operations (Summer dates under consideration) Legacy COA B757/B767 fleet Sabre/FANS upgrades start this summer – expanded KEWR participation expected Planned FAA Media day (Print/TV) this summer International Participation Update: - BAW UK CAA approval letter received by FAA DLH, SAS CAA approval letters pending AFS-50 completed final approval briefing with NY IFO reps to cover BAW, SAS, DLH ops – IFO approval pending BAW ready to resume DCL operations (B777/B787) Federal Aviation Administration KEWR DCL Trials Status Update • EJA Trials Participation Update: - • ATOP Database Integration with 28 day DTAP DB Build: - • Use of Initial DCL uplinks (Voice for Revisions) Continued UM79 FMS mitigation research (RC) Expanded TO waypoint uplink options Process to receive updates on regular cycle from the FAA TC Continued outreach with ZNY TMU for implementing Route Structure rules and Field 6 marking Federal Aviation Administration KMEM DCL Trials Update • FDX Daily DCL Ops Ongoing: - • DTAP B7.1 running stable DTAP Processing 20-40 FDX DCL ops per push DCL/Route Revision benefits starting to appear (6/1) Final KMEM HADDS, FDIO Test NCP Extensions Submitted: - Scheduled for approval at the June NAS CCB 2nd extensions for each – this final extension seeks termination out to Jan, 2016 Federal Aviation Administration Additional • 6/17 – The ISSM office will conduct an annual DTAP security HW/OS evaluation utilizing the baseline B7.1 FAATC Data Comm lab DTAP • No issues expected Boeing DCL KMEM/KEWR Stats Reporting Federal Aviation Administration Questions ? KUSA Federal Aviation Administration